Practice launch
From lease to first claim paid
Opening a practice is a sequencing problem. The space, the payer contracts and the billing process all take months, and only running them in parallel gets you to opening day able to collect. We run all three, under one calendar.
Quick answer
StafGo Health runs one path from lease to collections: buildout managed as your owner’s representative, provider credentialing started during construction because payers take months, insurance verification and billing configured before opening, and the first claims ready to go out the week you open. Each piece is priced on its own published list.
The four pieces, on one calendar
| Piece | What happens | When it runs |
|---|---|---|
| Buildout | Site evaluation, design coordination, permits, construction managed as your owner’s representative | From month 1 |
| Credentialing | Applications to the payers you choose, followed to effective dates | Starts during construction; payers commonly take 90 to 180 days |
| Billing readiness | Fee schedules, payer enrollment, clearinghouse, verification setup, access and BAA | Final weeks of construction |
| Go live | Verification from day one, first claims out opening week | Opening |
The sequencing rule that pays for everything
Most payers pay from the credentialing effective date forward, and treatment provided while an application is pending is generally not billable to that plan afterward. A buildout and a credentialing cycle take similar months; run in sequence they produce a finished space that cannot bill in network, run in parallel they finish together. That one scheduling decision is worth more than any fee negotiation in your first year.
Enter wherever you are
- Still choosing a space: start with buildout and a site evaluation before you sign the lease
- Space underway: start credentialing now; the timeline guide shows why today beats next month
- Weeks from opening: billing readiness and verification can still be live for day one
- Already open and out of network: credentialing first, and interim billing set up honestly around the dates you actually have
As in any construction project, costs and timelines are good-faith estimates: final costs can vary somewhat and construction timelines may shift with market conditions, permitting and contractor availability.
Each piece carries its own published price: construction management quoted per project, credentialing per provider, billing from the flat monthly band, verification per check. The pricing page has every number we publish. Medical offices follow the same path through medical office construction.
Questions and answers
Questions and answers
What does the practice launch path include?
Four pieces, sequenced: site evaluation and buildout managed as your owner’s representative; provider credentialing started during construction because payers take months; billing readiness, meaning fee schedules, payer enrollment, clearinghouse and verification configured before opening; and billing live from the first week. Each piece is priced on its own published list, and you can take any piece alone, but the value is in the sequencing.
Why does credentialing have to overlap the buildout?
Because the two clocks run at similar lengths and only one of them is movable. A buildout commonly runs several months; credentialing commonly runs 90 to 180 days per payer from a complete application, and most payers pay only from the effective date forward. Run in sequence, the practice opens out of network; run in parallel, contracts land around opening day. The overlap is the whole trick.
Who does the actual construction work?
Licensed, independent local contractors and subcontractors do the physical work. StafGo Health acts as your owner’s representative: we arrange, engage and coordinate those trades, keep the schedule honest through constant contact, navigate permits and inspections with you, and report progress to you weekly. Each contractor remains responsible for its own work, licensing and insurance; we remain responsible for the coordination.
Can you also handle the marketing launch?
Website, local search presence and patient acquisition sit with our sister agency, which builds and markets dental practice websites as its whole business. We coordinate the handoff so the practice opens with its phone ringing, but we keep the disciplines separate: billing and construction management on one side, marketing on the other, each accountable for its own results, with one calendar shared across all of it.
What does the launch path cost?
Each piece has its own price rather than one bundled number, because practices arrive at different stages. Construction management is quoted per project after a site conversation. Credentialing is per provider on the published list. Dental billing starts at the published flat monthly fee, which suits a practice with no volume yet. Verification is per verification. The pricing page carries every published number.
We already have a space. Can we start from credentialing?
Yes. The path has no minimum entry point: practices join at the buildout, at credentialing, or at billing readiness alone. What matters is the calendar from wherever you stand: if the space is done and credentialing has not started, that is the urgent item, and the dental credentialing timeline guide on this site shows exactly how the months play out from a complete application.
Start with your own numbers
Share an aging summary for a free billing audit: a written report on what is collectable and what we would do first.